A Fast, Efficient and Friendly Building and Maintenance Service You Can Depend On.

RSJ & Steel Beam Installation

RSJ & Steel Beam Installation In Wrexham

Structural Alterations & Load Bearing Wall Removal Experts

At Quirks Property Maintenance Ltd, we provide professional RSJ and steel beam installation services across Wrexham.

We specialise in load bearing wall removal, structural alterations, and creating open-plan living spaces. Whether you’re opening up a kitchen, installing bifold doors, or carrying out major internal alterations, we manage the full process from initial assessment through to completion.

All works are carried out safely, correctly, and in full compliance with current Building Regulations.

RSJ Installation in Wrexham – Load Bearing Wall Removal Specialists

We carry out RSJ installation in Wrexham for load bearing wall removal, open-plan living, and structural alterations.

Many projects involve combining spaces such as kitchens and dining areas, often alongside load bearing wall removal, kitchen renovations, and garage conversions to create modern, functional layouts.

Our experience ensures all structural works are completed safely, efficiently, and to a high standard.

RSJ Installation Services We Provide

• Load bearing wall removal
• RSJ (Rolled Steel Joist) installation
• Steel beam installation for structural openings
• Knock-throughs between rooms
• Structural openings for bifold and sliding doors
Chimney breast removal and structural support works
• Structural alterations for extensions and renovations

What’s Included in Our RSJ Installation Service

• Structural engineer coordination (if required)
• Supply and installation of RSJ / steel beam
• Padstones and correct load bearing supports
• Temporary works including Acrow props and Strongboys
• Building Control coordination and inspections
• Making good ready for plastering and final finishes

Our RSJ Installation Process

Structural Assessment & Design
We work alongside structural engineers to obtain calculations and specifications for all steel beams and RSJs.

Preparation & Temporary Works
Temporary supports including Acrow props, Strongboys and needles are installed in accordance with TWf 2017:03 guidance.

Installation of RSJ / Steel Beam
Installation includes correct bearing, padstones, and load distribution to ensure full structural integrity.

Building Control Compliance
All works are carried out in line with Building Regulations and inspected at key stages.

Making Good
We complete all associated works, leaving the area ready for plastering and final finishes.

Why RSJ Installation is Required

RSJs are used to support structural loads when removing load bearing walls or creating openings within a property.
Without proper support, structural movement, cracking, or failure can occur. Installing the correct steel beam ensures loads are safely transferred and the building remains structurally sound.

Signs You May Need an RSJ

• You are removing an internal wall
• You want to create an open-plan layout
• You are installing bifold or sliding doors
• Cracks are appearing around openings
• You are altering the structure of your property

Common Structural Issues We Resolve

• Cracked walls following incorrect wall removal
• Sagging ceilings due to lack of support
• Undersized or incorrectly installed beams
• Chimney breast instability
• Structural openings without proper support

Safety, Compliance & Professional Standards

• All works comply with current Building Regulations
• Structural calculations are followed precisely
• Temporary works installed safely and correctly
• Load paths properly supported
• Building Control inspections carried out

Case Study

RSJ Installation Case Study – Wirral

A recent project in Wirral involved removing a load bearing wall to create an open-plan kitchen and dining space.
The works included installation of a structural steel beam, padstones, and full temporary support during installation. The project was completed within two days, with minimal disruption, and all works were approved by Building Control.

RSJ Installation Case Study – Flintshire

Removal of a load bearing wall between a kitchen and living room to create a larger open-plan space.
The works included installation of a steel beam with padstones, full temporary support, and Building Control sign-off. The project was completed within two days and left ready for kitchen installation.

Recent RSJ Installations Across the Region

We regularly carry out RSJ installation and structural alterations across:
• Chester (Hoole, Handbridge, Boughton)
• Flintshire (Mold, Buckley, Connah’s Quay)
• Wrexham (Gresford, Rhos, Ruabon)
• Cheshire and the Wirral

What Our Customers Say

“Excellent service from start to finish. The team removed a load bearing wall and installed an RSJ with no issues. Everything was explained clearly and completed to a high standard.”
“Very professional and reliable. Work was completed on time and everything left clean and tidy. Would highly recommend.”
“Great communication throughout the job. You can tell they know what they’re doing, especially with structural work.”
“Turned up on time, worked efficiently and completed the job exactly as agreed. Really pleased with the result.”
“Very professional job, everything done properly and safely. Would definitely use again.”

Why Choose Quirks Property Maintenance Ltd

• Detailed, transparent, and itemised quotations
• All works carried out in line with current Building Regulations and industry standards
• Strong focus on safety, compliance, and correct installation methods
• High standard of workmanship with attention to detail
• Reliable scheduling, clear communication, and fully managed projects
• Established local company with a proven track record
Our quotations are based on a fully detailed, compliant, and professionally managed scope of works. When comparing with other quotations, we strongly recommend ensuring a like-for-like specification is being provided.

Areas We Cover

Chester, Flintshire, Wrexham, Cheshire, Ellesmere Port, the Wirral and North Wales.

Frequently Asked Questions

Do I need Building Control approval for RSJ installation?

Yes, all structural alterations require approval to ensure compliance with current Building Regulations.

Yes – we offer both planned maintenance schedules and emergency reactive repairs.

Typically 1–3 days depending on the size and complexity of the project.

Costs vary depending on access, size of opening, and structural requirements. A detailed quotation will be provided following assessment.

Yes – our team includes NAPIT-approved electricians and qualified engineers for plumbing, heating, and ventilation.

Yes, Building Control inspections are carried out at key stages.

Yes, we cover Wrexham.

Get a Quote for RSJ Installation

If you’re planning a load bearing wall removal or structural alteration, we can provide a detailed and compliant quotation based on your requirements.
We recommend sending:
• Photographs of the area
• Structural drawings (if available)
• A brief description of the works
This allows us to provide an accurate estimate quickly before arranging a site visit.

Get in Touch

Send Photos via WhatsApp for a quick assessment.

Our Commitment

Long-lasting, professional solutions using proven industry methods.
Scan the code