Specialist Building & Property Maintenance Services You Can Depend On.

DEMOLITION, STRIP OUT AND CLEARANCE

Demolition, strip out and clearance
North Wales, Cheshire and Wirral

Garages, outbuildings and conservatories taken down. Offices, shops and units stripped back to a clean shell. Sites cleared and left safe, with the waste gone. One contractor for the lot, working across North Wales, Cheshire and Wirral.

Garages, outbuildings and internal strip outs
Waste cleared as we go, not left for you
Priced from your photographs
 
 
WhatsApp or email gets the quickest reply. We come back to you as soon as we can.
Google5.0★★★★★Based on 150+ Google reviews
Trading since2008
£5 millionpublic liability insurance in place
Workmanship guarantee on completed works
One contractorAll trades under one roof

In short: we take structures down and premises back to a bare shell, and clear everything away. Small domestic demolition — garages, outbuildings, sheds, conservatories, boundary walls — and commercial strip outs for offices, shops and industrial units. We do not fit a space back out afterwards; if you need that as well, we will say so at the start so you can plan around it.

Demolition and strip out: the stage before anything new goes in

Most of this work is the start of something else. A garage comes down to make room for an extension. An old outbuilding or a tired conservatory goes so the garden can be used properly. An office is stripped between tenants, a unit is cleared before a sale or a change of use, or a lease is ending and the premises have to go back to the landlord the way they were let. Our job is to take it down or take it out safely, get the waste off site, and hand back a clear, safe space that the next stage can start from.

Two things decide how a job goes. The first is access — a detached garage on an open drive is a different day to a brick outbuilding behind a terrace, and a ground-floor unit with a roller shutter is a different week to a third-floor office with one lift. The second is what is in the fabric of the building. Older garage roofs, ceiling tiles and pipe lagging can all contain asbestos, which is why we will not start without a survey in hand.

What we take down and take out

Concrete sectional garage with a corrugated roof before demolition, and the concrete base left in place after it was taken down and removed

Garages, outbuildings and sheds

Single and double garages, brick and block outbuildings, timber sheds, stone or brick farm buildings. Taken down by hand or with machinery depending on access, the slab left or broken out as you need, and the site cleared.

Dark-framed lean-to conservatory on a brick base against the back of a house, before removal

Conservatories, boundary walls and garden structures

Conservatories and lean-tos dismantled, boundary and garden walls taken down, pergolas, decking and old play structures removed. The base left tidy for whatever goes there next.

Suspended ceiling grid with the tiles taken out, showing the steel beam and metal deck above

Partitions, ceilings and floors

Demountable and stud partitions, glazed screens and door sets. Suspended ceiling grids and tiles, raised access floors, carpet, vinyl and tile coverings back to the slab. Redundant cabling, trunking and containment once the supplies are isolated. Non-structural only — anything carrying load stays until an engineer has specified it.

Skip loaded with boards, timber and plasterboard taken out during a strip out

Fitted joinery and fixtures

Reception counters, fitted desking, kitchen and tea point units, shelving, shopfittings and signage. Taken apart rather than broken up where it is coming out in one piece.

Office with old computers, monitors and boxes gathered up ready for clearance

Clearance and making safe

Loose contents, redundant equipment and leftover stock cleared. Exposed edges, openings and fixings made safe, and the shell left swept and ready to hand over.

When a structural engineer is needed

Not everything that looks like demolition is a demolition job. Taking out an internal wall, opening up between two rooms, removing a chimney breast or anything else that might be holding the building up is structural work, and it needs an engineer’s specification before anyone picks up a breaker. We do that work as structural alterations, properly designed and quoted, rather than treating it as a knock-down.

If you are not sure which side of the line your job sits on, send us the photographs and say what you are hoping to do. We will tell you straight away whether it is a demolition and clearance job or one that needs an engineer first.

Asbestos: what has to be in place before we start

This is the part of a strip out that people most often leave too late.

Where a building may contain asbestos, the Control of Asbestos Regulations 2012 require a refurbishment and demolition survey before work begins that could disturb the fabric. That survey is the duty holder’s responsibility, which on a commercial property normally means the owner or the managing agent rather than the contractor. Buildings constructed or refurbished before 2000 are the ones to be careful with, and in practice that covers much of the older commercial stock.

For homeowners this most often means the garage roof. Corrugated asbestos cement sheets were fitted to garages and outbuildings for decades, and many older ones still have them. For commercial premises it is more often ceiling tiles, floor tiles, pipe lagging and boards behind fittings.

What that means for your job is simple. Send us the survey with your enquiry if you already have one. If you have not had one done, tell us and we will say so in the quotation rather than price around it. Our quotations are prepared on the basis that a current refurbishment and demolition survey is provided before work starts. Where asbestos is found we can arrange its removal by a contractor licensed for that work where licensing applies, priced separately, before the demolition or strip out begins.

We will not start a strip out without that survey. It is not a formality, and taking a chance on it is how a straightforward job turns into a very expensive one.

Waste, and what leaves site

Demolition and strip out produce a lot of waste in a short space of time, and where it ends up is the client’s problem as much as the contractor’s. Quirks Property Maintenance Ltd is a registered waste carrier, so what comes off your site goes to licensed waste and recycling facilities and is recycled wherever it can be. On request, we can give you a copy of our waste carrier registration and the waste transfer notes showing where your waste was taken. We clear as we go rather than letting it build up, keep what can be separated out of general waste, and leave the site or premises swept.

We photograph the site when we hand it back, and you can have the photographs on request. Together with the photographs you sent us at the start, that gives you a before-and-after record, which is worth having for a tenant at the end of a lease or a landlord whose managing agent will ask what was done.

North Wales, Cheshire & Wirral

Where we work

Line drawing of a mini excavator loading rubble into a skip
  • Chester and CheshireChester, Hoole, Handbridge, Ellesmere Port, Great Sutton — CH1–CH4, CH65–CH66
  • Flintshire and DeesideDeeside, Connah’s Quay, Queensferry, Buckley, Mold, Holywell — CH5–CH8
  • WirralBirkenhead, Bebington, Heswall, Wallasey, West Kirby — CH41–CH49, CH60–CH63
  • Wrexham and North WalesWrexham, Gresford, Rhosllannerchrugog, Ruabon — LL11–LL14
North WalesNORTH WALESFLINTSHIREWrexhamWREXHAMChesterCHESTERWirralWIRRALEllesmere PortELLESMERE PORTConwyCONWYDenbighshireDENBIGHSHIRECheshireCHESHIREA55M53M56A483A494Boundaries © OpenStreetMap contributors

We cover North Wales, Cheshire and Wirral for demolition, strip out and clearance. If you are not sure whether we cover your area, send the details and we will tell you.

Recent demolition and clearance projects

BUCKLEY, FLINTSHIRE — PRIVATE HOUSE, STABLE BLOCK

Recent demolition project in Buckley

A disused stable block at a private house in Buckley was taking up most of the yard. The owner asked us to take it down, clear everything away and leave the concrete base it stood on as hardstanding, to make space for their plans for the area.

BEFORE

A blockwork range nobody was using

The block was a single-storey range of rendered blockwork stables with timber doors, a concrete-tiled pitched roof along the main run and a flat-roofed end block at the house end. A concrete apron ran the length of the front, with the gravel drive beside it. It was sound enough to stand, but it had no use left and it took up the ground the owner wanted back.

Before anything was touched, the roof coverings and the flat-roofed end block were inspected for anything that might contain asbestos. Older outbuildings of this age are where it tends to turn up, in roof sheets and soffit boards, and it is the first thing to rule out on a demolition. Nothing of concern was identified on inspection.

Rendered blockwork stable block with timber doors and a concrete-tiled roof at a private house in Buckley, before demolition
The stable block as we found it — rendered blockwork, timber doors and a tiled roof, with the flat-roofed end block nearest the house.
DURING

Roof off by hand, then the walls down by machine

The roof came off first. The tiles were stripped by hand from ladders and the roof itself, stacked and barrowed away, and the battens, felt and roof timbers followed. Taking the roof down this way, rather than pulling it off with the machine, keeps the tiles whole for loading and means the walls are standing clear before the plant goes near them.

With the roof gone, a mini excavator worked along the range taking the blockwork down to base level, with a site dumper running the rubble to a stockpile clear of the house. The timber garden building at the end of the yard and the boundary fencing stayed in place throughout. The stockpile was then loaded and taken away by Quirks — nothing was left for the owner to deal with.

Two operatives in hi-vis stripping roof tiles from a single-storey stable block by hand, with the end block already down to its walls
Roof tiles coming off by hand before any plant went near the walls.
Stockpile of demolition rubble — blockwork and brick — on a gravel yard beside a fence after a stable block was taken down
Blockwork and tiles stockpiled clear of the house, ready for loading.
Operative on a site dumper beside a mini excavator taking the blockwork walls of a stable block down to base level
The last of the walls coming down to base level, with the dumper taking the rubble away.
AFTER

Base kept, yard back

The concrete base the stables stood on was left in place and cleared, so the owner has a level hardstanding where the buildings were instead of a patch of broken ground. The ground around it was tidied back to the gravel.

The yard now runs clear from the gate to the timber garden building, with the stable range gone and the rubble off site.

Cleared gravel yard with the concrete base left in place where a stable block stood, and a timber garden building beyond
The yard cleared, with the base left in place and the garden building beyond untouched.

This case study covers the demolition of the stable block, the removal of everything that came off it and the clearing of its base. It does not cover any work to the base itself, any groundworks, or whatever the owner goes on to do with the space.

  • Roof coverings and the flat-roofed end block inspected for possible asbestos-containing materials before work began; nothing of concern identified on inspection
  • Roof tiles stripped by hand and stacked for loading
  • Battens, felt, roof timbers and doors removed
  • Blockwork walls taken down to base level with a mini excavator
  • Rubble moved by site dumper to a stockpile clear of the house
  • Concrete base left in place and cleared as hardstanding
  • All rubble, tiles and timber loaded and taken off site by Quirks
  • Adjoining timber garden building and boundary fencing left in place
  • Welfare unit on site for the duration of the job

Project Information

LocationBuckley, Flintshire
PropertyPrivate house
StructureSingle-storey rendered blockwork stable range — tiled pitched roof with a flat-roofed end block
ServiceDemolition and site clearance
CustomerHomeowner
Pre-start checkRoof coverings and end block inspected for possible asbestos-containing materials; nothing of concern identified
MethodRoof stripped by hand; walls taken down with a mini excavator and site dumper
The baseConcrete base left in place as hardstanding
WasteLoaded and taken off site by Quirks

DemolitionStable blockBuckleySite clearance

WEST KIRBY, WIRRAL — BUNGALOW

Recent demolition project in West Kirby

A bungalow in West Kirby had a garage standing at the bottom of its rear garden — roughly sixteen feet by ten, concrete sectional panels carrying a corrugated sheet roof. No machine could get anywhere near it. The garden is reached on foot only, with about five steps between it and pavement level, so the whole building had to come apart into pieces small enough for two people to carry out.

BEFORE

An old sheet roof, and the question that decides the job

The garage ran across the end of the garden, boarded and painted on the outside, with a shallow pitched roof of corrugated sheeting along its full length and a single translucent sheet let in part way for light. Underneath, it was built the way a great many garages of that age were built: precast concrete panels bolted together, carrying a light steel roof frame.

On a roof like that, the first question is not how to take it down — it is what the sheets are made of. Corrugated sheeting on an older garage is one of the places asbestos cement is commonly found, and the answer changes how the work is priced, how it is handled and where it can go afterwards. Here a sample of the roof material had already been analysed, and the analysis supplied to us recorded no asbestos detected in the sample. That is what allowed the sheets to be unfixed by hand and taken away as ordinary demolition waste, and it is why the job could be quoted as a straightforward dismantle.

Timber-boarded garage painted green at the end of a rear garden, with a corrugated sheet roof, before demolition
The garage as it stood at the bottom of the rear garden, with the corrugated roof just showing above.
Side elevation of a garage showing a moss-covered corrugated sheet roof with one translucent rooflight sheet
The full run of the roof from the side — corrugated sheeting, heavily mossed, with one translucent sheet let in for light. A sample of this material was analysed before the works were quoted.
DURING

Sheet by sheet, then the frame, then the panels

The roof came off first. Each sheet was unfixed and lowered whole rather than broken up — an old sheet roof is always handled that way, and a sheet that comes down in one piece can be carried out and loaded in one piece instead of being swept up off the floor. The fixings and the components carrying the sheets came out with them.

With the roof off, the steel frame stood on its own and was taken apart, and the garage door and its fittings were removed. The wall panels were then unbolted and lowered. A sectional garage is bolted together rather than built up, which is the one thing in its favour on a site like this: it comes apart into sections already close to the size two people can carry, and nothing has to be broken up to make it moveable.

Operative removing corrugated roof sheets from the steel frame of a concrete sectional garage during demolition
Taking the corrugated sheets off. The ribbed grey panels behind are the walls of the garage.
Steel roof frame of a concrete sectional garage left standing after the roof sheets were removed
Roof sheets down and the steel frame standing on its own, with the walls and door still in place.
AFTER

Base kept, garden back

The concrete base was to stay, and it did. Once the last of the structure was off it, the slab was swept and washed down, leaving the footprint of the garage as clean hardstanding at the end of the garden. Breaking out the base, taking up foundations below it and landscaping the area afterwards were all outside this job.

Everything that came off the building was carried out of the rear garden by hand, over the steps to the loading point, and taken away for disposal through an authorised waste facility. The area around the base was left clean and swept.

Two operatives sweeping and washing down a concrete garage base after the garage above it was demolished and removed
The concrete base washed down after the garage was removed — kept in place, as instructed.

This case study covers the dismantling, demolition and removal of the garage and the clearing of its base. It does not cover any work to the base itself, to the garden around it or to the bungalow.

Wow…what a fantastic job these guys have just done. Luke, Ethan and Dove ( apologies if I’ve misspelt that) are a great team all of whom were courteous, polite and happy in their work. They demolished my concrete sectional garage in a morning and cleared the site to perfection. It’s not often that I’m impressed by tradespeople but these guys were truly brilliant. I’ve no hesitation in highly recommending them. Well done lads 👍

— Richard Manley, Google review

  • Analysis of a sample of the roof material, supplied by the client, recorded no asbestos detected in the sample
  • Corrugated roof sheets unfixed and lowered whole, then removed from site
  • Roof fixings and supporting components removed
  • Steel roof frame dismantled
  • Garage door and fittings removed
  • Concrete sectional wall panels unbolted and taken down
  • Materials reduced to sections that could be carried through pedestrian-only access
  • All arisings carried by hand from the rear garden, over approximately five steps, to the loading point
  • Waste loaded, removed from site and disposed of through an authorised waste facility
  • Existing concrete base left in place and swept clear
  • Immediate area left clean and tidy

Project Information

IssueA redundant garage at the bottom of a rear garden, reachable on foot only
PropertyBungalow, West Kirby, Wirral
StructureConcrete sectional garage, approximately 16ft x 10ft, corrugated sheet roof on a steel frame
Pre-start informationAnalysis of a sample of the roof material, supplied by the client, recorded no asbestos detected in the sample
AccessPedestrian only, with approximately five steps between garden and pavement level — all materials handled by hand
WorksRoof sheets, roof frame, door and concrete wall panels dismantled and removed; waste taken away through an authorised waste facility
OutcomeGarage removed; existing concrete base retained in place and swept clear
LocationWest Kirby, Wirral

DemolitionConcrete sectional garagePedestrian access onlyWest Kirby

DEESIDE, FLINTSHIRE — COMMERCIAL UNIT

Recent clearance project in Deeside

A commercial unit in Deeside needed its contents and loose fittings cleared out, with the partitions and the fixed fit-out left exactly as they were. The job was to empty the unit, not to alter it.

BEFORE

A unit full of contents

The unit still held the contents and loose fittings of its last use, spread through the rooms the partitions divided it into. Nothing about the building itself was to change; it was what the unit contained that had to go.

DURING

Contents out, partitions left standing

The contents and loose fittings were cleared and taken away. The partitions, the fixed fittings and the services stayed in place throughout — this was a clearance of what the unit held, not a strip of the unit itself.

AFTER

Handed back clear, layout intact

The unit was handed back clear of its contents and loose fittings, with the rooms divided as they were and the fixed fit-out untouched.

Back room of a commercial unit with old tills, computer monitors, tables and shelving waiting to be cleared
Contents left in the back room before the clearance
Stacked chairs and tables gathered in the rear yard of a commercial unit ready for removal
Chairs and tables gathered in the rear yard ready to go
Skip at the rear of a commercial unit loaded with furniture and fittings cleared from inside
Cleared furniture and fittings loaded for removal

This case study covers the clearance of the unit’s contents and loose fittings only. It does not cover any work to the partitions, fixed fittings, services or fabric of the building, which were left as found.

  • Contents and loose fittings cleared from the unit
  • Partitions, fixed fittings and services left in place throughout
  • Everything removed taken away by Quirks
  • Unit handed back clear of contents

Project Information

LocationDeeside, Flintshire
PropertyCommercial unit
ServiceCommercial clearance
What came outContents and loose fittings
What stayedPartitions, fixed fittings and services — untouched
WasteTaken away by Quirks

ClearanceCommercial unitDeesideContents removal

What customers say

5.0 · 150+ Google reviews

★★★★★

Excellent communication from the start. I needed a small extension demolished and door bricked up. Michael gave a competitive quote and all work was carried out both promptly and efficiently. All the workmen were polite and respectful. Very happy with the work completed.

Louise Mitchell

★★★★★

I can highly recommend this place as it didn’t even took a week between me messaging them first time to job being fully carried out all waste taken care off and builders on place very friendly and professional, everything was explain to the smallest detail. Looking forward to my renovation with trusted place like this.

Bartosz Kolodziejczak

★★★★★

Quirks Property Maintenance was commissioned for a charity of which I am a trustee to covert existing space into office and treatment rooms, and a gym. The scope covered removal of existing internal structures and rebuilding, including electrical and plumbing reconfiguration. Unexpected structural problems were encountered which QPR immediately recognised, proposed and delivered a solution. All the work was completed with a minimum of delay and cost. QPR work has been to high standard, delivered professionally and with excellent customer focus. This was a substantial investment for our charity and we are very please with result.

Michael Martin

Read all our reviews on Google

How it works

Need something taken down or cleared? Send us a photo.

Send us photographs on WhatsApp or by email — the structure from a couple of sides, or the space to be stripped — with a rough idea of size, how we would get to it, and anything you already know about asbestos. We will review it and come back to you with a written quotation.

  1. 1Send photographs of the structure or the space, and a rough size
  2. 2Send your refurbishment and demolition survey if you have one
  3. 3We review what you have sent and ask if anything is missing
  4. 4You receive a written quotation setting out the scope, what is left in place, and the days on site
  5. 5Once accepted we agree a start date and, for occupied premises, a working window that suits the building
Send Photos on WhatsApp
Customer sending Quirks photos of damp, gutters, cracked brickwork and a leaking pipe on WhatsApp

Request a quotation

    So we can confirm we cover your area.





    JPG, PNG, HEIC, WEBP or PDF. One photograph per box.

    We use your details and photographs to deal with your enquiry — our privacy policy explains how.

    Prefer to send photos? Message us on WhatsApp

    Common questions

    How much does garage demolition cost in Chester?

    There is no standard figure, because the price follows the job rather than the size of the garage alone. What moves it most is what it is built from and how it is roofed, whether the slab is staying or coming out, how close it sits to the house and the neighbours, and how we get the waste away — an open driveway is a different day to a shared path behind a terrace. An asbestos cement roof adds a separate cost for licensed removal before we start.

    Most jobs we can price from photographs — send yours on WhatsApp or by email and we’ll come back with a written quotation.

    How much does a commercial strip out cost?

    The same applies: the price follows the building. What moves it most is how much is coming out and how it is fixed, whether there is a raised floor or a suspended ceiling with services in the void, how the waste gets off site — a ground-floor unit with a roller shutter is a very different job to a third-floor office with one lift — and the hours you need us to work. Access, parking and whether the building is occupied around you all count too. Send photographs and a rough floor area and we will come back with a written quotation.

    Do I need an asbestos survey before demolition or a strip out?

    If the building may contain asbestos, yes — a refurbishment and demolition survey is required under the Control of Asbestos Regulations 2012 before work begins that could disturb the fabric, and arranging it is the owner’s or duty holder’s responsibility. Anything built or refurbished before 2000 should be treated as needing one until a survey says otherwise, and that includes the corrugated roof on an older garage. We will not start without it.

    What is left when the garage or outbuilding has gone?

    Whatever you and we agree before the job starts, and the quotation says so in plain words. The usual decisions are the slab or base (left as hardstanding, or broken out and taken away), the footings under it, a boundary wall the building was built against, and anything you want kept — bricks, slabs or roof tiles for reuse elsewhere. Say which when you send the photographs. Settling it on the quotation rather than on the day is what stops a small demolition turning into an argument about a pile of bricks.

    Can you take down a garage that is attached to the house?

    Yes, but it is a different job from a detached one and we price it as such. The wall it shares with the house stays, the roof junction and flashing have to come apart without damaging what they are fixed to, and anything running through the garage — a supply, a drain, a downpipe — has to be dealt with first. The quotation sets out what comes down and what is left exposed, so you know what the house wall will look like the day we leave.

    What about electricity, water or gas going to the building?

    Tell us when you enquire. A garage with a light and a socket, a unit with its own meter, a workshop with a water feed — all of these have to be isolated before anything comes down, and gas and electrical work is carried out by Gas Safe and NAPIT registered engineers, never by the demolition team. Where a supply has to be capped off permanently rather than just isolated, we say so in the quotation.

    Do you take the waste away?

    Yes. Waste removal is set out in the quotation, and we clear as we go rather than leaving partitions and ceiling tiles in the car park for you to deal with. The shell is swept before we hand it back.

    Will you take out an internal wall or a chimney breast?

    Not as a demolition job. Anything carrying load stays where it is until a structural engineer has specified what is needed. We do structural alterations as a separate piece of work, so if something load-bearing has to come out we can quote that properly rather than guess at it on site.

    Does demolition or a strip out need Building Regulations approval?

    Taking down a detached garage or outbuilding, or removing non-structural partitions, ceilings and floor coverings, does not normally engage the Building Regulations on its own. It is the work that follows — the extension going where the garage was, the fit-out after the strip — or anything affecting structure, fire separation or means of escape, that usually does. Some demolition needs notice to the local authority first, and a structure in a conservation area or attached to a listed building may need consent. Flintshire, Wrexham, Conwy and Denbighshire come under the Regulations as they apply in Wales; Chester, Cheshire and Wirral come under the Regulations as they apply in England. If you are unsure which applies to your building, ask your building control body before work is planned.

    Can you work evenings or weekends?

    Often, yes. Occupied buildings and shopping parades frequently need the noisy work done outside trading hours, and the same goes for a garage coming down beside a neighbour who works nights. Tell us what window you have when you send the photographs and we will price it against those hours rather than quoting a daytime job and renegotiating later.

    Do you fit the space back out afterwards?

    No. We strip out and clear, and hand the premises back as a shell. If you need the space fitted out afterwards you will want a fit-out contractor, and we would rather tell you that at the enquiry stage than halfway through. The building work that follows a garage coming down — the extension or the garage conversion — is a different matter, and we do that.

    Written and reviewed by Michael Quirk, Director.

    Got something to come down or clear out? Send us a photo.

    Scan the code
    Powered by Joinchat